Terry L. Grimes v. State of Illinois

45 Ill. Ct. Cl. 21 Illinois Court of Claims Filed 1993-06-02 No. 84-CC-0267
Disposition: (No. 84-CC-0267-Claim dismissed.)
Cite as: Terry L. Grimes v. State of Illinois, 45 Ill. Ct. Cl. 21 (1993)
General Court of Claims 45 dismissed 1990s Terry L. Grimes v. State of Illinois 45 Ill. Ct. Cl. 21 1993-06-02 (No. 84-CC-0267-Claim dismissed.) /opinions/v45-p0125-1/

TERRY L. GRIMES, Claimant, u. THE STATE OF ILLINOIS, Respondent. Opinionfibd]une 2,1993. THOMAS P. NAUGHTON & ASSOCIATES, for Claim- ant.

Case summary

Claimant sought damages for injuries from a motorcycle accident caused by a roadway defect. The court dismissed the claim because the underlying civil settlement of $150,000 exceeded the $100,000 maximum tort award, and the contract claim was barred by the statute of limitations.

Claim type: Personal Injury Negligence

AI-generated summary from the opinion text — may contain errors. The opinion text and PDF above are the official record.

THOMAS P. NAUGHTON

& ASSOCIATES, for Claimant.

ROLAND W. BURRIS,Attorney General (ROBERT J. SKLAMBERG, Assistant Attorney General, of counsel), for Respondent.

TORTS-motorcycle struck roadway defect-Claimant’s recovery in civil action exceeded maximum award for tort injuries4laim dismissed. Where the Claimant, who was injured when he lost control of his motorcycle after hitting a hole in the roadway, settled a civil personal injury action against the excavating company involved for $150,000, the Claimant’s tort action against the State was dismissed because the underlying civil court settlement exceeded the $100,000maximum award available for tort injuries.

LIMITATIONS4ontract claim arising out of motorcycle accident was [*22] barred by statute oflimitations. The Claimant did not have a valid cause of action against tlie State under a contract theory as a result of injuries suffered when his motorcycle struck a hole in the roadway since, at the time he filed suit, the statute of limitations on such actions had run, and tlie Claimant could not make a good faith argument that he was a thirdparty beneficiary of a contract between the State and the excavators involved in the incident.

OPINION

PATCHETT,

J.

This claim arises from a motorcycle accident which occurred on August 4,1981, in Will County, Illinois. The Claimant allegedly lost control of the motorcycle he was operating after hitting a hole in the roadway.

The Claimant filed a notice of intent and a verified complaint in 1983. The claim was placed on a general continuance while he pursued an action against John and Ron Excavating. That case was settled for $150,000.

Subsequent to the settlement of the action against the excavating company, the Respondent filed a motion to dismiss in 1985. The basis of the motion to dismiss was that there was a maximum award of $100,000 for tort injuries, and this amount had been exceeded in the underlying civil lawsuit. The Claimant then filed a response to that motion on July 8, 1985.

In May 1987, this Court gave the Kespondent 60 days to file a memorandum of law in support of the motion to dismiss and granted the Claimant 120 days from that date to file a memorandum of law in opposition of the motion. The Respondent filed a memorandum of law, but the Claimant then filed a motion to substitute attorneys and for an extension of time. In [*23] October 1987, this Court granted the Claimant leave to change counsel and an extension of time in which to file a responsive memorandum or otherwise plead. The Claimant filed an amended verified complaint instead of a memorandum of law. That complaint attempted to state a cause of action in contract. The Respondent then moved to dismiss that complaint.

In March, 1988, a commissioner of this Court denied a request which had been made by the Respondent for section 2-611 sanctions. He granted the parties additional time to file memoranda of law.

This Court then entered an order denying all motions to dismiss and remanded this case to the commissioner. The Respondent subsequently filed a motion to vacate that order. About two years later, the complete file, along with the motion to vacate, was finally forwarded to the judge assigned to this case.

The Court vacated its previous order of December 1989 and set the matter for oral argument on all pending motions. Oral argument was held on March 24, 1993.

After the hearing at oral argument and reviewing the file, the Court finds as follows:

The underlying civil court settlement of $150,000 exceeded the amount available to the Claimant under a tort theory of action. Therefore, that motion to dismiss on a tort theory should have been granted.

The Claimant attempted to refile a cause of action under contract theory. Unfortunately, the statute of limitations had run. In addition, the Claimant could not make a good faith claim that he was a third-party beneficiary of a contract between the State of Illinois [*24] and the excavators. Further, the contract claim did not relate back to the original filing sufficient to take it out of the statute of limitations.

Therefore, this Court grants the motion to dismiss this claim.

Official volume 45 (Containing cases in which opinions were filed and orders of dismissal entered, without opinion for: Fiscal Year 1993 – July 1, 1992–June 30, 1993)  ·  All opinions in this volume  ·  Also on CourtListener

This text is OCR/derived from the official volume and may contain errors. The PDF is authoritative. Boundary pages shared with the adjacent opinion are reproduced whole, so the page image may show a neighbor's opening or closing lines; the transcript text itself is opinion-scoped. See About & sources.