Illinois Court of Claims Opinions
General Court of Claims
Download PDF

American Electric Construction Company v. State of Illinois

35 Ill. Ct. Cl. 137 Illinois Court of Claims Filed 1982-06-25 No. 78-CC-0037
Disposition: (No. 78-CC-0037-CIaimant awarded $59,388.15.) Award: $59,388.15 Agency: Capital Development Board
Cite as: American Electric Construction Company v. State of Illinois, 35 Ill. Ct. Cl. 137 (1982)
General Court of Claims 35 awarded 1980s American Electric Construction Company v. State of Illinois 35 Ill. Ct. Cl. 137 1982-06-25 (No. 78-CC-0037-CIaimant awarded $59,388.15.) /opinions/v35-p0294-1/

AMERICAN ELECTRIC CONSTRUCTION COMPANY, Claimant, 0. THE STATE OF ILLINOIS, Respondent.

Case summary

The claimant, an electrical contractor, sought payment for extra work performed on a state construction project. The court awarded $59,388.15 based on a stipulation between the parties, finding the work was authorized by state representatives.

Claim type: Contract

Cases cited: Heil v. State (1976), 31 Ill. Ct. Cl. 386

AI-generated summary from the opinion text — may contain errors. The opinion text and PDF above are the official record.

Headnotes

  1. T YRONE C. FAHNER, Attorney General (EDWARD C. HURLEY, Assistant Attorney General, of counsel), for Respondent.
  2. CoNmcrs-extras-stipulation-award granted. An award was granted to an electrical contractor for extras performed under its contract as the parties carefully considered the merits of the claim in arms-length bargaining and arrived at a stipulation as to the amount due Claimant.

This cause comes before the Court on a stipulation filed by the parties wherein it is requested that this Court make an award in Claimant’s favor in the amount of $59,388.15.

The Claimant, an electrical contractor, contracted with the State to perform electrical work on the construction of the Mental Retardation Facility in Tinley Park, Illinois.

During the course of construction the Claimant performed certain work which it claimed was not called for under its contract. The major portion of this extra work (count I) involved making underground connections between the fire alarm system at the Mental Retardation Facility and the fire alarm system at the existing facility. According to Claimant’s compilation (exhibit A, attached to the stipulation), the value of this work totaled $48,455.00. Additionally, the Claimant performed 22 other tasks (count II), the value of which Claimant contends is $20,317.70 (exhibit B, attached to the stipulation). When attempts to resolve these problems failed, the complaint herein was filed.

As to the first count of the complaint, the Capital Development Board agrees that an addendum issued by the project architects erroneously deleted all work required to connect the new fire alarm system with the old system. After inspecting the project site and examining [*139] Claimant’s cost figures, the Board values this work at $45,865.00. The Board concurs that this work is a valid extra.

Regarding count 11, the board agrees that 17 of the 22 tasks do constitute work not covered by the contract. The value of this work is $13,522.15.

This Court has frequently held that deviations from plans may be orally authorized by the State notwithstanding a requirement that no extras will be allowed except as ordered in writing. Heil v . State (1976), 31 Ill. Ct. C1. 386.

Herein the Board does not dispute the fact that the Claimant was directed to perform the work in question by its representatives at the project site.

While this court is not bound by any stipulation made by the parties to a case, such a stipulation will not be rejected out of hand. It appears that the parties herein have carefully considered the merits of this claim with the give and take which characterizes arms-length bargaining. Such being the case, the Court allows the stipulation of the parties.

It is hereby ordered that Claimant, American Electric Construction Company, be awarded the sum of $59,388.15 (fifty nine thousand three hundred eighty eight dollars and fifteen cents) comprising $45,865.00 (forty-five thousand eight hundred sixty five dollars and no cents) under count I and $13,522.15 (thirteen thousand five hundred twenty two dollars and fifteen cents) under count 11of the complaint herein in full and final satisfaction of any and all claims arising under cause number

Official volume 35 (Containing cases in which opinions were filed and orders of dismissal entered, without opinion for: Fiscal Year 1982 – July 1, 1981–June 30, 1982; Fiscal Year 1983 – July 1, 1982 – June 30, 1983)  ·  All opinions in this volume  ·  Also on CourtListener

This text is OCR/derived from the official volume and may contain errors. The PDF is authoritative. Boundary pages shared with the adjacent opinion are reproduced whole, so the page image may show a neighbor's opening or closing lines; the transcript text itself is opinion-scoped. See About & sources.